Garlick Helicopter Corporation

STC - Fin Spar Modification


Rotorcraft Service Center
PO Box 1766
Hamilton, MT 59840
Tel 406-363-6121
Fax 406-363-6124


Attention 204/UH-1 Operators!

FAA approved STC numbers:
UH-1H SR-09176RC
UH-1B,L SR-09177RC
UH-1F,P SR-02222RC
204B SR-09202RC

This redesigned spar assembly provides
“Unlimited fatigue cycle life.”

  Fin Spar

AD-99-25-12 UH1 series requires replacement of the FIN SPAR.
For more information or scheduling of installation call.
1-800-366-6795

PROVEN ENGINEERING AND OPERATING HISTORY

Since October of 1997, the Garlick Helicopter Corporation, FAA approved Tail Boom Fin Spar Modification has been installed in nearly 60 aircraft with accumulated operating times of over 12,000 hours. The majority of these aircraft are performing Repeated Heavy Lift Operations, with no reported problems. GHC was the first to engineer a totally re-designed assembly and does not use previously problematic aluminum caps with unproven cold-worked rivet holes. It provides infinite “Fatigue Cycle Life”

Why pay more for less?